Proactive Scheduling of Multi-location Final-assembly Operations with Uncertain Material Kitting Time
LI Sihan
MO Chaoxiong
LIU Jianjun
CHEN Qingxin
MAO Ning
Machine-generated Keywords:
Publication Date:2021-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:11( 104-114 )
Industrial Engineering Journal

Industrial Engineering Journal

ISTICPKU
ISSN:1007-7375
Year, Vol.(Issue):2021,24(3)