A Closed Loop Supply Chain Network Equilibrium Model with Remanufacturing Investment
CAO Bingru
ZHU Bowen
Machine-generated Keywords:
Publication Date:2021-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:9( 1-9 )
Industrial Engineering Journal

Industrial Engineering Journal

ISTICPKU
ISSN:1007-7375
Year, Vol.(Issue):2021,24(3)