Integrated Optimization of Project Payment Scheduling Based on the Maximization of Net Present Value: A Case Study
JIN Yan
HE Zhengwen
Machine-generated Keywords:
Publication Date:2018-01-01
Industrial Engineering Journal

Industrial Engineering Journal

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2018,21(4)