Production Logistics Synchronization Optimization Through ATO Pulling in Industrial Park
WU Qiang
QU Ting
YAN Zhijun
ZHANG Ting
HUANG Guoquan
Abstract:To address problems induced by the assembly to order (ATO) production in industrial park, e.g. production logistics information synchronization and high operation cost, the "three-stage two-degree" production logistics synchronization (PLS) control mechanism was proposed based on Internet of Thing. Using simulation analysis of the cooperative optimization algorithm, it showed that 1) the earlier is the order dynamic, the more obvious is the benefit of synchronization control; 2) that the synchronization control across enterprises in industrial park can effectively help reduce logistics costs; and 3) that the later the dynamic happens and the bigger is the demand order, the more difficult the synchronization control will be, but its economic benefits will be better relative to un-synchronization.
Keywords:production logisticssynchronization controlcollaborative optimization(CO)
Publication Date:2017-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:12( 37-48 )
Industrial Engineering Journal

Industrial Engineering Journal

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2017,20(4)