The Randomness of the Critical Chain and its Application in the Progress of Construction Project
Yan Wen-zhou
Ren Ge-ye
Abstract:The CPM method is first used to calculate the critical path and duration of the project .But the CPM method does not consider the constraints on the construction of various resources .When the methods are based on the critical chain , the critical chain on the construction process of resource constraints is ob-tained.In fact, a variety of resources required in the construction process are influenced by some external factors.The completion of these processes exhibits a certain probability .Therefore, ideas and methods of stochastic processes are applied to obtain the optimal critical chain .Eventually , the optimal critical chain and duration are calculated .The method is of significance to guide the actual construction .
Keywords:critical chainthe randomness of the critical chainresource constraintsnetwork optimization
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 111-114,120 )
Industrial Engineering Journal

Industrial Engineering Journal

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2014,(6)