A Fuzzy Resource Constrained Multi-Project Schedule Based on Priority Rule
Zhang Lian-ying
Li Yan-wei
Sun Ruo-xin
Abstract:Based on the analysis of the present relevant research , a fuzzy model of resource constrained multi-project scheduling is investigated .By this model the uncertainty of resource parameters of activities and the characteristics of the multi-project schedule are taken into account .Then a heuristic algorithm based on priority rule is proposed to solve the model .Finally, the feasibility and effectiveness of the model are shown by scheduling of example projects .
Keywords:resource constrainedmulti-project schedulingpriority ruleheuristics
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 13-17 )
Industrial Engineering Journal

Industrial Engineering Journal

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2014,(3)