Forming and Scheduling of Virtual Flow Lines for Hull Manufacturing in Shipbuilding
Keywords:shipbuildingvirtual flow lineschedulinggroup technologygenetic algorithm
Publication Date:2010-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 58-63 )
INDUSTRIAL ENGINEERING JOURNAL

INDUSTRIAL ENGINEERING JOURNAL

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2010,13(1)