A Method of Project Schedule Risk Transmission based on PERT
Machine-generated Keywords:
Publication Date:2008-07-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 14-18 )
INDUSTRIAL ENGINEERING JOURNAL

INDUSTRIAL ENGINEERING JOURNAL

ISTICPKU
ISSN:1007-7375
Year, Vol.(Issue):2008,11(4)