Evaluation of Project Economy Based on Interval Analysis
Guo Jun-peng
Wu Yu-hua
Machine-generated Keywords:
Publication Date:2008-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 16-19 )
INDUSTRIAL ENGINEERING JOURNAL

INDUSTRIAL ENGINEERING JOURNAL

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2008,11(3)