An Integrated Model for Shortening the Responding Time of Multi-stage SCM
CHEN Xi-yong
MA Shi-hua
LIN Yong
Machine-generated Keywords:
Publication Date:2005-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 61-65 )
INDUSTRIAL ENGINEERING JOURNAL

INDUSTRIAL ENGINEERING JOURNAL

PKUISTIC
ISSN:1007-7375
Year, Vol.(Issue):2005,8(1)