🤖This page has been translated by AI and may contain inaccuracies. Please refer to the original content for clarification.

Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques
Xiaowei Feng
Nong Zhang
Keywords:Mining engineeringPosition-optimizationGob-side entry retainingPartial-road-in backfilling
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
International Journal of Coal Science & Technology

International Journal of Coal Science & Technology

ISTIC
ISSN:2095-8293
Year, Vol.(Issue):2015,2(3)