Operation Scheme of Subsurface flow Constructed Wetland in North China
Abstract:According to the experiments of three years about plant,coverage of plant,hydraulic load and hydraulic retention time,based on AHP to confirm the weight of each water quality index,research the operation scheme of the subsurface flow constructed wetland system in North China.Expect to get the maximum water purification of the subsurface flow constructed wetland ecosystem and realize the sustainable utilization.The operation scheme of the transition period,the Room-temperature period and the Low-temperature period can reference for designing the subsurface flow constructed wetland system in North China.
Keywords:subsurface flow constructed wetlandoperation schemeAHPhydraulic load
Publication Date:2011-01-01
Online Publishing Date:2026-09-12(First online date of this platform, not the publication date of the document)
Journal of Irrigation and Drainage

Journal of Irrigation and Drainage

PKUISTIC
ISSN:1672-3317
Year, Vol.(Issue):2011,30(5)