Study on ground pressure and control technology of a fully mechanized top coal caving longwall face passing a pre-driven roadway
LU Heng
ZHANG Chuanbao
WU Zhenhua
WANG Yuchang
Machine-generated Keywords:
Publication Date:2022-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:13( 47-59 )
