Development and application on computer-aided system of tunnel construction risk analysis and evaluationLIU Baoguo, WANG Jian1-7,13
Pressure change from the cross aisle when the train passing through parallel tunnel of high-speed railwayLUO Jianjun, WU Jin, CHEN Pengfei8-13
Control optimization of drilling and blasting parameters during mountain tunnel construction periodFANG Yu, LIU Kaiyun14-20
Study of key techniques of metro stations construction using PBA based enlarging large diameter shield tunnelSUN Changjun, ZHANG Dingli, ZHENG Hao, WANG Le21-27
Stress evolutions of some key points in the structure of subway station using cover and top-down excavation methodRAN Daoping, XIAO Feng, CHEN Peipei, BAI Bing28-32
Traffic flow prediction model of highway tunnel based on PSO-Gaussian process coupled algorithmWAN Liangyong, LIU Kaiyun33-39
Finite element analysis of hall-style ancient wooden structure considering damage factorsYANG Na, WANG Yang, QIN Shujie40-44,51
A calculation method of remaining life of ancient wooden components based on the cumulative damage theoryWANG Yang, YANG Na45-51
Precipitation threshold for subway openings/station entrances under heavy rainfallJIANG Hui, ZENG Yaguang, XU Tiankun, GU Aijun, LU Yi, WENG Yongnan, QIU Wei52-58