Research on the model and algorithm of the flexible operation sequence for the first-level maintenance in the EMU depot
HAN Baoming
ZHAO Peng
LI Dewei
Machine-generated Keywords:
Publication Date:2021-02-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:8( 8-15 )
