Determination of risk control values in the project of shield tunnel across the existing bridge pile foundation
ZHANG Haiyan
HE Ping
HU Yougang
WANG Xiuying
XU Pengcheng
Keywords:tunnelpile foundation of bridgeresidual capacitynumerical calculationrisk control indicators
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 45-50,54 )
Journal of Beijing Jiaotong University

Journal of Beijing Jiaotong University

PKUISTIC
ISSN:1673-0291
Year, Vol.(Issue):2013,37(6)