Analysis on Dewatering and Drainage Construction Technology of High Water Level Foundation Pit in Subway Station
NIE Jing
Machine-generated Keywords:
Publication Date:2021-03-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 78-81 )
Journal of Anyang Institute of Technology

Journal of Anyang Institute of Technology

ISSN:1673-2928
Year, Vol.(Issue):2021,20(2)