TBM Construction method of long-distance Tunnel in Deep-buried soft-hard interbedded Geology
ZHAO Weidong
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 69-72,95 )
