On Organization and Optimization Method for Multi-storey Flowing Construction with Irregular Paces
LI Hai-tao
CHENG Jian-xin
Abstract:By introducing the characteristics of flowing construction with irregular paces, this paper summarized and put forward a working time formula of multi-storey flowing construction with irregular paces. It was noticed that different implementation sequence of construction sections had a significant impact to working time of multi-storey flowing construction with irregular paces, and tried to find out the optimal sequence among different con?struction sections implement sequences by matrix method, finally got the shortest total working time. Case study proved that the working time optimization can be achieved only by adjusting construction sections sequences, but not increasing resources.
Keywords:multi-storey constructionflowing construction with irregular pacesworking timematrix method
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 52-57 )