🤖This page has been translated by AI and may contain inaccuracies. Please refer to the original content for clarification.

Prediction and Suppression of Electrical System Fault Time for Roadheader
Abstract:The roadheader is the main production equipment for coal mining and tunnel excavation. The electrical system determines the equipment's availability underground, coal output, and production efficiency. Long fault time of the electrical system can lead to prolonged shutdowns, significant safety hazards, failure to meet supply targets, and also cause frequent tracking services, poor customer satisfaction, and low maintenance quality reputation.
Machine-generated Keywords:
Publication Date:2025-08-30
Online Publishing Date:2025-09-12(First online date of this platform, not the publication date of the document)
Pages:5( 52-56 )
Journal of Smart Mine

Journal of Smart Mine

Year, Vol.(Issue):2025,6(8)