🤖This page has been translated by AI and may contain inaccuracies. Please refer to the original content for clarification.

Overall Application Architecture of Intelligent Construction in Kekai Coal Mine
Abstract:Shaanxi Yanchang Petroleum Yulin Kekai Coal Industry Co., Ltd. (referred to as Kekai Coal Mine) has a recoverable reserve of 1,196.12 Mt in its mine field, with a service life of 85.4 years. The No. 2 coal seam has a recoverable reserve of 646.95 Mt and a service life of 46.2 years. The coal seam adopts the longwall mining method along the strike, comprehensive mechanized mining technology, and full caving method for managing the roof of the working face. The length of the transfer working face is 350 m. To ensure normal face succession, the entire mine is equipped with 4 intelligent fast excavation working faces and 2 comprehensive excavation working faces.
Machine-generated Keywords:
Publication Date:2025-04-30
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 21-27 )
Journal of Smart Mine

Journal of Smart Mine

Year, Vol.(Issue):2025,6(4)